Seminars & Trainings

Malaysia

Essentials for Successful Variation / Change Order Claims

On October 21, 2026
Categories: Malaysia
Hits: 467

The brochure will be available two (2) months prior to each seminar date

 

The benefits

  • Speakers Who Are Experienced construction industry practitioners
  • Comprehensive Seminar Notes
  • Live Questions & Answer Sessions
  • Reference to Malaysia Standard Forms of Contract

 

Who should attend

  • Anyone involved in the administration of construction contracts, including Architects, Engineers, Quantity Surveyors, Contractors, Subcontractors, Principals, Lawyers, Government Bodies, Employers, Consultants, Project Managers, Suppliers, Planners / Schedulers

 

What participants have said about Charlton Martin Seminars

  • “Comprehensive seminar material”
  • “The Q & A sessions and case studies during the workshop were very practical and related to my work”
  • “The content and language used by the speakers was easy to understand and straight forward”
  • “Speakers interacted well with the participants”
  • “Practical knowledge that helps in my daily work”

 

CPD Credit Points

  • This seminar qualifies to meet the CPD requirements of the Construction Industry Development Board, Board of Quantity Surveyors Malaysia, Board of Architects Malaysia, Board of Engineers Malaysia and international professions
  • HRDF claimable
  • An e-certificate of attendance will be issued

 

Early Bird Registration with full payment - RM 1,150 per person

1 - 3 participants - RM 1,300.00 per person

4 - 10 participants - RM 1,200.00 per person

For registration of more than 10 pax, please call Danial / Maisarah / Sheila K for special rates at Tel: 603 2287 5175 or email This email address is being protected from spambots. You need JavaScript enabled to view it.

 

The fee includes lunch, coffee/tea breaks and seminar notes

*The seminar fee payable is inclusive of Sales & Service Tax

 

 

 

 

ABOUT THE SPEAKERS

“RodneyRODNEY MARTIN
BSc, LLB(Hons), MSc, MRICS, FCIArb, FMIArb, FSIArb, FMSAdj
Rodney is the Chief Executive of the Charlton Martin Group, having previously been employed as Group Regional Director and Senior Vice President of two major contracts consultancy groups in the Asia Pacific Region.  Of his 37 years of experience, 26 have been at senior level in this region.  Additionally, Rodney has worked for many clients in Europe, Africa, the Middle East and India.  Rodney holds dual qualifications in quantity surveying and law and as a chartered quantity surveyor is a specialist in construction contract consultancy providing professional and technical advice to clients relating to contract documentation, contractual claims, dispute avoidance and resolution.  He is an accredited mediator, panel arbitrator and panel adjudicator with the Asian International Arbitration Centre and is an experienced speaker within the region.  He is a Fellow of the Chartered Institute of Arbitrators as well as both the Malaysian and Singapore Institute of Arbitrators.  Rodney has been appointed as Expert Witness on matters relating to quantum and delay and has acted as lay advocate in arbitration proceedings.  Rodney has also been appointed as an arbitrator, mediator, adjudicator and dispute adjudication board member in Malaysia.  He has lived and worked in Kuala Lumpur since 1997.

 

“John WongJOHN WONG
BSc(Hons), LLB(Hons), Dip. Int. Arb., FCIArb, FMSAdj, MRISM, Reg.QS
As a Director (Quantum & Delay) of Charlton Martin Consultants Sdn Bhd. John holds dual qualifications in quantity surveying and law with nearly 30 years of experience. John has testified as an Expert Witness in 22 arbitration or court proceedings giving clear, structured testimony that assists tribunals in navigating complex delay and quantum issues. John understands not only how claims are prepared — but how they are scrutinised, challenged and decided. This dual perspective enables him to assist counsel and tribunals with opinions that are technically rigorous, legally coherent and evidentially robust.

His experience as a Quantity Surveyor, Claims Specialist, Adjudicator and Arbitrator gives him a rare 360-degree understanding of construction disputes — from project site realities to tribunal deliberations. Furthermore, John has been an articulate public and in-house seminar speaker since 2007.

 

“Shawn ChongSHAWN CHONG SEOW NYEE
BSc(Hons), PGDip, MSc, MBA, MSc, MRICS, MCIOB, MRISM, ICEACA, Reg.QS, Chartered Construction Manager
Shawn is a well-qualified multi-disciplinary professional with over 35 years of experience in construction, engineering, energy and infrastructure projects. His experience on large scale projects covers many sectors, executed under various contractual arrangements, inter alia, Traditional Contracts, Management Contracting, Construction Management, Design & Build, Turnkey, BOT, PFI and PPP. Shawn specialises in the provision of dispute related services, having previously been employed in two major contract consultancy groups and as senior commercial manager of a large multi-national company where he headed the commercial and risk division, managing and directing operation resources, oversees contract administration, arbitration, adjudication, and other legal matters. The combination of his technical, quantity surveying, project management, IT, law and business administration skills enables him to assist clients in a broad range of issues and maximising the prospects of success in a cost-effective manner. He counsels employers, contractors and subcontractors in commercial, retail, office, residential, civil engineering, industrial park, power plants and airport projects and was recognised for his ability to effectively resolve complex and difficult commercial and contractual matters.

 

CHARLTON MARTIN – Construction Contracts Consultants
Michael Charlton and Rodney Martin have worked together successfully for more than two decades, the majority of which have been as Chairman and CEO of the Charlton Martin Group. The Charlton Martin Group was established in 2007 with practices in Hong Kong, Singapore and Malaysia, providing services to the construction industry on contractual matters and contract administration; claims preparation; training and seminars; mediation; adjudication and arbitration services; litigation support and expert witness services. The Group is renowned for bringing high standards of integrity and professionalism to the work undertaken in each location.

 

 


Download Our 2026 Seminar Calendar

Download Our In-House Training Courses

In House Trainings

“Logo IconThe Charlton Martin Group provides construction contract consultancy services to the construction, engineering, power, process, petrochemical, oil and gas industries worldwide, dealing specifically with the many disputes and varied problems, which frequently arise.

Copyright © 2026 Charlton Martin Consultants.
Copyright © 2026 Charlton Martin Consultants 
Charlton Martin Consultants Limited
Charlton Martin Consultants Sdn Bhd (200701023848)
Charlton Martin Consultants Pte Ltd (200713447R)

Share Us